Berendsen has recently published a case study on “Hydraulic Power Unit Manufactured For Export To An International Gold Mine”. The international gold mining operation project was led by a Brisbane-based Engineering Consultancy firm. The topics covered are job specification, why Berendsen, solution, project challenges, and project outcome. The project was delivered on time after verifying using a comprehensive testing process.
Continue Reading